PC-2026-03-027 — Client Engineer approved ✅

SO-TN-2026-001 PC-2026-03-027
STR-SLB-08 · Rev 1
BM-C2-C4 · Beam
C2–C4 / FL-03
M25
6.12 m³ · 2 trucks
Pour 1 of 1
CHECKS A — Start conditions & checklist ✓ Approved by Client Engr.
Rebar & cover verified
Formwork checked & clean
Vibrator ready & tested
Cube moulds ready
View full checklist →
DURING POUR B — Truck batches, temperature & slump

Truck Batch Log

T1
Truck 1
Batch No: RMC-2026-0412-018
✓ Logged
RMC-2026-0412-018
6.0
09:18
09:45
28°C
90mm ✓
Yes — 1 set
Note: Good workability, no segregation observed. Concrete placed continuously.
T2
Truck 2 — In progress
Enter batch details as truck arrives
🚛 Arriving

During-pour Checklist IS 456

Check ItemClauseResult
DURING CONCRETING
Time between Mixing & Pouring ≤ 90 min Cl.13.1Cl.13.1
Weight of Mix Ingredients verified (batch ticket) Cl.10.2Cl.10.2
W/C Ratio within design mix spec Cl.6.1Cl.6.1
Slump (mm) — within specified range Cl.7Cl.7
Concrete Temperature ≤ 35°C Cl.13.1Cl.13.1
Pour Start Time logged
Pour End Time logged
Cube Sampling — sets taken, labelled & identified Cl.15.2Cl.15.2
Pour Complete → Post-Pour ›