M-Book Reports
Select an M-Book to view its full measurement report with pour details and BOQ reconciliation
Total M-Books
12
Tata Networking Hub
Locked / Billed
3
In RA BillsSubmitted
7
QueuedDraft
2
Entry pending
M-Book No.
Type
Pour Card / Element
Block/Floor
BOQ Item
Qty
Amount (βΉ)
Status
Action
MB-2026-044
Concrete
PC-027 Β· BM-A-B1B3-FL02
Block A Β· FL-02
RCC-BEAM-M25
0.949 mΒ³
8,494
Submitted
MB-2026-047
Concrete
PC-029 Β· SLB-A-FL04
Block A Β· FL-04
RCC-SLB-M30
18.163 mΒ³
1,62,560
Submitted
β PC-027 Beam: MB-2026-044 (Concrete) and FMB-2026-031 (Formwork) are linked β
FMB-2026-031
Formwork
PC-027 Β· COL-A1-FL02
Block A Β· FL-02
FW-COL-BLKA
2.088 mΒ²
877
Draft
MB-2026-028
Concrete
PC-025 Β· COL-A3-FL03
Block A Β· FL-03
RCC-COL-M25
21.00 mΒ³
1,87,950
Locked
M-Book Report
V
M-Book Report
Velantra ERP Β· Tata Networking Hub Β· Generated 15 Apr 2026
MB-2026-044
β
QS Approved
Block A Β· FL-02
π
M-Book Details
MB-2026-044πͺ£
Pour Details β Linked Pour Card
Pour card data| Field | Planned | Actual | Status |
|---|
π
Measurement (No. Γ L Γ B Γ H)
CPWD Format| Description | No. | L (m) | B (m) | H (m) | Qty | Remarks |
|---|
π
BOQ Reconciliation
BOQ Item| M-Book | Pour Card | Element | Date | Qty | Status |
|---|
β
Signatures
R. Suresh
Quantity Surveyor
β
Submitted Β· 15 Apr 2026
G. Kannan
Project Manager
β¬
Pending PM review
A. Mehta
Client Engineer
β¬
Pending
Velantra ERP Β· M-Book Report Β· Generated 15 Apr 2026 Β· Tata Networking Hub